
logo
  • 24HR EMERGENCY CALL OUT

    We will visit you within 2 hours in our areas.

  • 01276 986 130

  • Home
  • Services +
    • About Us
    • Electrical engineering, installation, lighting, Re-Wiring
    • Heating, ventilation, air conditioning
    • Reactive and planned preventative maintenance, boilers, pumps, plumbing
    • Refurbishment/fit out services, design, installation and project management
    • Security services, CCTV, alarm, access control
  • Projects
  • News
  • Mission Statement
  • Testimonial
  • The Team
  • Areas We Cover
  • Contact Us
  •  Search

Skip to Content

News

h6
Bonus_Eventus_Maintenance-03

Professional, Reliable, Affordable

Bonus Eventus
July 15, 2022
0
Share
July 15, 2022
Read More
Bonus_Eventus_Maintenance-02

Need Air Duct Cleaning Services?

Bonus Eventus
July 8, 2022
0
Share
July 8, 2022
Read More
Bonus_Eventus_Maintenance-01

Your Need to Repair or Replace Your HVAC System?

Bonus Eventus
July 4, 2022
0
Share
July 4, 2022
Read More
appolinary-kalashnikova-WYGhTLym344-unsplash

Power Your Buildings With Green Energy

Bonus Eventus
June 7, 2022
0
In the past we’ve talked a lot about the environmental impact of buildings, particularly when it comes to heating them and supplying them with water. And we’ve also mentioned the […]
Share
June 7, 2022
Read More
Bonuseventus_no-comments164

First line of gas safety in the plantroom is the gas solenoid. In case of emergency this must shut off the gas supply to prevent fires and explosion. Its regular check is part of the PPM and it is checked and tested during GSCs.

Bonus Eventus
May 17, 2022
0
Share
May 17, 2022
Read More
Bonuseventus_no-comments170

Dosing pots are used for adding chemicals to the system. Most of the cases it is anti corrosion inhibitor injected. To maintain the needed level of inhibitor in a system is one of the fundamental points for a heating system’s failsafe operation. Inhibitor levels are always checked at PPMs

Bonus Eventus
May 10, 2022
0
Share
May 10, 2022
Read More
Bonuseventus_no-comments172

The speed and switchover settings of twin pumps must be set up correctly to achieve the optimal circulation, heat distribution and for the longest lifespan possible. These are checked and adjusted if needed during ppm visits.

Bonus Eventus
May 8, 2022
0
Share
May 8, 2022
Read More
Bonuseventus_no-comments178

Leak marks on a pump are indication of a leaking shaft seal. If replaced in time it is a quick and rather cheap fix. If left this way it will damage the shaft and will cause much higher repair costs.

Bonus Eventus
May 7, 2022
0
Share
May 7, 2022
Read More
Bonuseventus_no-comments070

HVAC Maintenance 24/7/365 call out

Bonus Eventus
March 12, 2022
0
Share
March 12, 2022
Read More
Bonuseventus_no-comments068

HVAC Maintenance 24/7/365 call out

Bonus Eventus
March 12, 2022
0
Share
March 12, 2022
Read More

GET IN TOUCH

  • 27 Rorkes Drift, Mytchett, Surrey, GU16 6EH

  • 01276 986 130

  • info@bonuseventus.co.uk

logosbottom
BONUS EVENTUS © 2025 All Rights Reserved | Terms & Conditions | Privacy Policy

Call Now Button
We use cookies in accordance with our Cookie Notice. Please refer to our Cookie Notice here for more information on how we use cookies and how to adjust your browser settings to block cookies. If you consent to the use of cookies, please click Accept. We will not ask for consent for strictly necessary cookies, but if you choose to block strictly necessary cookies this may affect your website experience.
ACCEPT